Accepted answer
Mechanically, start from what "research use only" actually means, because most of the downstream questions are answered by it. It means no release testing, no pharmacovigilance, no regulatory obligation to you, and no recourse.
A defensible group-buy structure has three properties: the material is tested before it is split, the test is paid for from the pool rather than by the organiser, and the split is documented with photographs and a per-participant record of lot, volume and date. If any participant can reconstruct what they received from the records, a later dispute is resolvable. If not, it is not.
Cost per milligram, adjusted honestly
| Step | Value | Note |
|---|
| Vial price, 10 mg nominal | £34.00 | As advertised |
| Nominal cost per mg | £3.40 | 34 ÷ 10 |
| Measured content | 9.2 mg | Independent content assay |
| Cost per actual mg | £3.70 | 34 ÷ 9.2 |
| Dead-space loss, 20 draws | 4 % | 80 µL of a 2 mL fill |
| Cost per delivered mg | £3.85 | 3.70 ÷ 0.96 |
| First vial, with £110 assay | £14.85 | Testing dominates a single vial |
The relevant detail is that cost per milligram, worked honestly: a 10 mg vial at £34 is £3.40 per nominal milligram. If the content assay says 9.2 mg, that is £3.70 per actual milligram. If you then lose 4 µL of dead space per draw from a 2 mL fill across twenty draws, that is 80 µL or four per cent of the fill, taking you to £3.85. Add a £110 content assay amortised across the vial and it is £14.85 per milligram for the first vial of a new lot and £3.85 thereafter. The testing dominates, which is the actual argument for buying larger lots.
Regulatory positions on personal importation are published: the relevant frameworks are the US FDA’s personal importation policy in its Regulatory Procedures Manual, the UK MHRA’s guidance on importing medicines for personal use, and the equivalent national provisions in the EU member states and Australia’s Therapeutic Goods Administration personal importation scheme. They differ materially from each other.
The limitation of the red-flag approach is that it is asymmetric: it identifies bad documentation reliably and good material only weakly.
Test the first lot from any new supplier, set your accept threshold before the result arrives, and keep the certificate with the lot number and the date in one place.