Accepted answer
1.4 percentage points, and the direction is the informative half. Janoshik reports 98.2 per cent and the certificate 96.8, so the independent figure is higher. As impurity that is 1.8 per cent against 3.2 — 0.56 times as much unassigned area, which is the unusual direction and worth a second look at the integration. Method differences usually make the independent number the lower one, so an independent result above the certificate points at integration limits, a different wavelength, or a different definition of the main peak rather than at a better vial. Ask both parties for the method section before you decide which figure is wrong, because the answer is often neither.
Understanding purity requires separating the chemistry from the method from the reporting convention, and the three are not independent.
Sample solvent strength affects peak shape — if you inject in strong solvent on a gradient starting in weak solvent, the solvent peak can distort your main peak or create a false shoulder.
Mass shifts and what they usually mean
| Δ mass (Da) | Most likely cause | Distinguishing feature |
|---|
| +1 | Deamidation (Asn or Gln) | New peak, slightly earlier retention |
| −17 | Loss of ammonia | Often with deamidation |
| −18 | Dehydration / succinimide | pH-dependent, reversible |
| +16 | Oxidation (Met, Trp) | Earlier retention, light-related |
| −128 | Missing Gln or Lys | Deletion sequence from synthesis |
| 0 | Isomer: racemisation or scrambling | Same mass, shifted retention |
Tailing factor measures peak shape, and a badly tailing peak spreads into the region where small impurities live, forcing tangent-skim integration that assigns tail area to the main peak.
Inter-laboratory studies on identical peptide material routinely find half-a-per-cent to a full-per-cent spreads in reported purity on the same sample.
The caveat is that purity without identity is only half an answer — a high purity does not mean the peak is actually what you think it is.
The practical summary: ask for the chromatogram and the method, and ignore the headline number until you have both.